Location: Henderson Rd, Burpengary
Client: Moreton Bay Regional Council
Principal Contractor: SCC
Engineers: MBRC with SCC RPEQ as-con
certification
Start Date: 22nd August 2016
Finish Date: 14th February 2017
Value: $616,775.00
Contract Type: Lump Sum

Scope of Works:

MBRC engaged SCC to carry out culvert upgrade works at two sites alone Henderson Road.

The  works included:

  • Pavement excavation, disposal & reinstatement
  • 2 cell’s 1200x750 RCBC Installation
  • 4 Cell’s 2100x750 RCBC Installation
  • 375 & 600MM RC Pipe Installation
  • Removal & reinstate concrete footpaths.
  • New concrete culvert Headwalls, Wingwalls & Aprons
  • Structural concrete for future asphalt plant
  • New Stormwater Concrete Channels
  • Minor Earthworks (Grading & Levelling)
  • Topsoiling, Turfing and Hyromulching.
  • Pedestrian Fencing
  • Reinstatement (Timber bollards & Signs)
  • Relocation of Public Gym Area, Seat, Water Bubbler and Bin.

Challenges:

  • Working under constant pedestrian traffic
    and heavy vehicle traffic as we had to
    contraflow the traffic for the large majority
    of the entire contract duration.
  • Erosion and sediment control.
  • Working in flowing stormwater concrete
    channel waterway’s.
  • Environmental restraints working within
    stormwater concrete channel waterway’s.
  • Old Redundant Asbestos Watermain
    Removal and Disposal.
  • Pedestrian Walkway Floodlight relocation